The schedule looked fine when it went out this morning. Then an operator called out, the pallet you needed was still being fixtured off the machine, and a rush order landed from your best customer. By lunch, the real plan was back in a spreadsheet.
If that sounds familiar, the problem usually isn’t your planner. It’s that most scheduling tools only see machines. Skody AI sees the machine, the pallet, and the qualified person together, and it won’t call a job ready until all three are.
Why do high-mix production schedules fall apart?
In a high-mix shop, dozens of jobs compete for the same machines, people, and materials every day. A schedule that only counts machine hours will happily promise work the floor can’t deliver: the machine is open, but nobody qualified is available to run it, the right pallet is tied up, the material hasn’t arrived, or the outside operation isn’t back yet.
Someone still has to catch those conflicts, and that someone is usually your planner, rebuilding the schedule by hand every time something changes. The more often your schedule changes, the more time disappears into repair work instead of planning.
Who is Skody AI designed for?
Skody is built for manufacturers whose schedules change frequently and whose planners still spend significant time building or fixing the real schedule in spreadsheets. Its strongest fit includes:
CNC machine shops and precision manufacturers
Sheet-metal fabrication and mixed-operation plants
Aerospace, defense, and other complex discrete manufacturers
Shops running CNC pallet automation systems or planning unattended, lights-out production
Manufacturers that need a more executable schedule without replacing their ERP
When Skody is less likely to fit: simple, repetitive production with little constraint interaction; a company primarily shopping for a new ERP; a manufacturer looking for a broad MES or MOM replacement; or a shop whose current whiteboard or ERP schedule already holds up throughout the day.
What does Skody AI schedule?
Finite machine capacity. Work is placed only where usable capacity exists.
Qualified personnel. Shifts, availability, and operator skills are scheduled alongside machine demand.
Setups and changeovers. Sequencing accounts for setup pressure instead of treating every hour as interchangeable.
Materials and outside processing. Work isn’t scheduled as ready when required material or an outside operation is unavailable.
Pallet pools and shared resources. Pallets, fixtures, and other constrained resources are part of the model.
Lights-out production. Trusted work can be placed into unattended windows while respecting readiness constraints.
Disruptions. When a machine goes down, an operator is absent, or a rush order arrives, Skody proposes an updated feasible plan for planner approval.
What makes Skody different? Pallets and people are part of the schedule
Most production schedules begin and end with machine capacity. Skody builds one finite plan across the machine, the physical pallet or fixture, and the qualified person needed to run the operation. That isn’t three separate calendars. It’s one constraint model that won’t call work executable unless every required resource is available at the same time.
Pallet-pool and multi-part scheduling
In an automated CNC cell or flexible manufacturing system, an open machine doesn’t guarantee that work can run. The correct pallet, fixture, setup, and parts also have to be ready. Skody treats each pallet as a finite, schedulable resource, including:
Physical pallet identity and availability
The fixture and parts mounted on each pallet
Multi-part and tombstone loads
Pallet queue position inside the cell
Pallets being prepared away from the machine
Setup clustering and unattended production windows
The result is a schedule that never promises machine hours your pallet pool can’t physically support, which helps keep automated cells cutting through nights and weekends. Explore Skody pallet scheduling.
Human scheduling with an operator skills matrix
An available machine isn’t usable capacity if no qualified person is available to run it. Skody brings individual human capacity into the same production calculation. Its worker skills matrix can model:
Which people are qualified or certified for each machine or operation
Shift calendars, availability, and absences
Different skill levels and production assignments
One operator tending multiple machines at once
Labor requirements that change between setup and runtime
What-if staffing and cross-training scenarios
When someone calls out or labor coverage changes, Skody recomputes the plan around the people who are actually there, instead of leaving the staffing conflict for a supervisor to discover on the floor.
What happens when a machine goes down, or a rush job arrives?
Skody recalculates a feasible plan using current constraints and proposes an updated sequence. The planner reviews and commits the change, so your production team stays in control. Skody does the math; your people make the call.
How does Skody AI work with your ERP?
Skody doesn’t replace your ERP. The ERP remains the source for jobs, routings, and business records, and Skody becomes the production decision layer that turns that data into an executable schedule.
Skody runs live with ProShop, Fulcrum, and JobBOSS² and also integrates with Acumatica and SYSPRO. Microsoft Dynamics 365 and QuickBooks connectors are available on request. Skody says it can connect to any ERP; a connection to an ERP it hasn’t connected before typically takes about three weeks after signing.
What results have manufacturers reported?
At Three Sigma Manufacturing, Skody schedules 47 machine work centers. The company reports:
A 15% reduction in production delays
Scheduling time reduced from days to seconds
A planning horizon expanded from one week to one year
A computed baseline accepted by the planner on approximately 99% of days
These are customer-reported results from one implementation, not a guarantee of identical results for every manufacturer. Read the Three Sigma case study.
Skody AI at a glance
Pricing current as of October 22, 2026.
Best fit
High-mix CNC, fabrication, aerospace and defense, contract manufacturing, discrete assembly, additive, and mixed-operation plants with frequent schedule changes
Scheduling model
Finite capacity across machines, qualified labor, materials, setups, pallets, and outside processing
ERP connections
Live with ProShop, Fulcrum, and JobBOSS²; integrates with Acumatica and SYSPRO; Dynamics 365 and QuickBooks connectors on request; new ERP connections typically take about three weeks
ERP relationship
The ERP remains the system of record; Skody is the production decision layer
Time to value
Designed for a short path to a usable production baseline; timing depends on data readiness, integration, and operating-model scope
Pricing
Shop plan starts at $1,500 per month, month-to-month. Plant & Enterprise is custom-priced by machines or work centers, production complexity, workforce constraints, integrations, sites, and onboarding
Security and hosting
Every deployment is hosted in an ITAR-ready Gov Cloud environment; Skody reports SOC 2 Type II
How does On Time Edge help implement Skody AI?
Software alone doesn’t change how a plant schedules. On Time Edge provides the manufacturing process, systems integration, and adoption support needed to turn Skody into a working operating process, not just another installation. Since 2004, On Time Edge has helped manufacturers improve planning, scheduling, and execution.
Define the operating objective. Agree on the business problem, success measures, planning horizon, and the decisions the schedule must support.
Prepare the data. Validate jobs, routings, calendars, work centers, cycle times, and the ERP data Skody will use.
Model the real constraints. Map alternate machines, operator skills, shifts, setups, pallets, materials, and outside processing.
Test the schedule with planners. Compare the computed plan with shop knowledge, resolve exceptions, and establish planner-control rules.
Guide go-live and adoption. Train planners and production leaders, define the daily scheduling rhythm, and help the floor transition to the new plan.
Improve after launch. Review schedule performance, correct data and constraint assumptions, and expand the model as your needs evolve.
Who does what: Skody supplies the scheduling engine and product capabilities. On Time Edge helps you configure the operating model, integrate it with your current systems, and make the new scheduling process stick.
Frequently asked questions about Skody AI
What is Skody AI?
Skody AI is finite-capacity production scheduling software for high-mix CNC, fabrication, and discrete manufacturing. It builds an executable schedule around actual machine capacity, qualified labor, material readiness, setups, pallets, and outside processing.
Does Skody AI replace an ERP?
No. Your ERP remains the system of record. Skody uses ERP jobs, routings, and related production data to calculate and maintain the operating schedule.
Which ERP systems work with Skody AI?
Skody runs live with ProShop, Fulcrum, and JobBOSS² and integrates with Acumatica and SYSPRO. Microsoft Dynamics 365 and QuickBooks connectors are available on request, and new ERP connections typically take about three weeks after signing.
How quickly can a manufacturer implement Skody AI?
Skody is designed for a short path from ERP data to a usable production baseline. Total timing depends on data readiness, constraint modeling, integrations, and scope.
How much does Skody AI cost?
The Shop plan starts at $1,500 per month, month-to-month. Plant & Enterprise deployments are custom-priced based on machines or work centers, production complexity, workforce and skill constraints, integrations, sites, and onboarding. See current Skody pricing.
How does Skody AI schedule pallet pools?
Skody treats pallets as finite, schedulable resources, accounting for pallet identity, mounted fixtures, loaded parts, queue position, and pallets being prepared off-cell, then coordinates pallet availability with machines, setups, and lights-out windows.
How does the worker skills matrix affect the schedule?
Skody models each person’s qualifications, certifications, shift availability, and ability to tend one or more machines. An operation is scheduled as executable only when the required machine capacity and qualified human capacity are available together.
What does On Time Edge do during a Skody implementation?
On Time Edge helps define the scheduling model, prepare ERP and operating data, map real shop constraints, guide planner adoption, support go-live, and establish a continuous-improvement process.
Aaron drives the organizational strategic direction and manages the company's day-to-day activities. He brings over 25 years of experience in management, manufacturing technology, supply chain, and systems architecture to client engagements. Aaron helps clients understand the opportunities available with select technology, implementation, and change management and has shown global manufacturing companies how to boost profitability, productivity, and performance with their initiatives.